30.12.2018 – Day 2

5P9Z/P

Today was a very nice sunny day. Small problems with the antenna eliminated. Many good connections on the lower bands. But even here, the bad conditions are noticeable. Preparations are underway to build the 200m RX Beverage antenna. The longest connection so far Australia.